Projects

NoDescriptionContract ValueYear of Completion
1Upgrading of Holland Road Pumping Station
– Design, supply, install, test and commissioning M&E Equipment in the pumping station.

Owner: Public Utilities Board, Singapore
S$2,878,339March 2005
2Jurong WRP Contract 4
– Design and build 2 sets DAFT, Polymer Preparation System

Main Contractor: Dayen Environmental Ltd
Owner: Public Utilities Board, Singapore
S$1,155,000May 2004
3
Pumping Station Tembusu Ave, Jurong Island
Mechanical & Electrical Equipment

Main Contractor: Planar One Associates P/L
Owner: Jurong Town Corporation
S$1,652,134December 2005
4Upgrading of Pepys Pumping Station

Owner: Public Utilities Board, Singapore
S$1,313,000
December 2003
5Design, supply, install, test and commission M&E Equipment at Tengah Pumping Station

Owner: Public Utilities Board, Singapore
S$966,000December 2003
6Upgrading Pulau Saigon Pumping Station
-The works comprise of design, supply, install, test and commission plant equipment, electrical switchboard, surge suppression system, vibration studies and monitoring, sump model tests

Owner: Public Utilities Board, Singapore
S$1,996,000January 2004
7Kim Chuan WRP
– Design and build 12 nos. Primary and Final Clarifiers and other M&E Works in the waste water treatment. 8 nos. primary clarification facilities and 4 nos. final clarifications before being sent to dissolved air flotation thickeners (DAFT) for thickening. The sludge from DAFT is sent to digester and part as Returned Activated Sludge (RAS)

Owner: Public Utilities Board, Singapore
S$2,537,380December 2004
8Westech Mixing Equipment at Bunus & Pantai – Malaysia.

Main Contractor: Hitachi Plant
USD1,240,000December 2005
9Upgrading of Tanjong Penjuru Pumping Station
– The works includes pumps, screens, hydraulic operated inlet penstocks, valves, electric hoists, designing ventilation system & odour control system, surge analysis and sump model test

Owner: Public Utilities Board, Singapore
S$1,054,000January 2006
10Upgrading of Penjuru Pumping Station
–The works comprise of construction of new electrical substation, the design, manufacture, supply, install, test and commission plant equipment including surge suppression measures, vibration studies, vibration monitoring and sump model test

Owner: Public Utilities Board, Singapore
S$1,854,000February 2006
11Design, and Build Lime Preparation and Dosing for Ulu Pandan Newater Factory
–This is a fast track contract of 5 months including civil works. This plant is capable of handling the lime dosing of 146 millions liters per day capacity. The Newater plant belongs to Keppel Seghers Engineering

Owner: Public Utilities Board
S$2,182,000February 2007
12Proposed Greasy Waste Receiving Facilities at Jurong WRP

Owner: Public Utilities Board
S$1,980,000April 2008
13Proposed Odour Treatment Plant to Existing Sewage Pumping Stations for North Sentosa Cove

Owner: Sentosa Development Corporation
S$1,025,000April 2008
14Construction of STW, Phase 1, Package 3
–Kuala Sawah, Damasara and Sunggala, Malaysia
- Design, supply, installation, testing and commissioning of 8 sets WesTech clarifiers, 2 sets Grit
RemovalEquipment and 20 sets of Polymer Feeder.
US$1,358,600
RM1,172,000
May 2008
15Proposed Gateway Avenue Roadworks for Resorts World at Sentosa

Owner: Sentosa Development Corporation
$3,175,568June 2008
16Sewer Rehabilitation in Various Pumping Stations catchments – Contract 8

Public Utilities Board
S$8,583,110January 2009
17Proposed Punggol Reservoir: Dams, Gates, Dredging and Ancillary Works, Contract 1S$1,421,000April 2009
18Construction of an Abstraction Pond and ancillary facilities at Gambas AvenueS$1,350,000September 2009
19Replacement of M&E Equipment at Jurong WRPS$5,920,950December 2011
20Modification to Chestnut Avenue Waterworks
– Chemical Preparation System; Lime/ Alum/Polymer/ Powdered Activated Carbon (PAC) System
S$4,346,000June 2012
21Sewer Extension in Pasir Ris Framway
Areas – Contract 1
S$1,200,000June 2012
22Design and construction of lime & Carbon dioxide dosing plant at Ulu Pandan WRP for NIP (NEWater Infrastructure Plan)

Client: Public Utilities Board
$9,517,960March 2013
23Water Treatment Equipment for SCI Integrated Waste Water Treatment Plant at Banyan, Tembusu Jurong Island

Main Contractor – Sembawang Construction Ltd
$1,128,760March 2013
24Proposed Bertam DAF Phase 2 WTP, Durian Tunggal, Melaka

Client: Koh Brothers Eco Engineering Ltd
RM6,200,000March 2014
25Proposed Used Water Lift Station at Jurong Town Hall Road – M&E Works$1,633,800February 2015
26Operation & Maintenance of Ulu Pandan NEWater Pumping Station & Ulu Pandan Chemical Dosing Plant.

Owner: Public Utilities Board
$808,000August 2015
27Construction & Maintenance Services for a Powdered Activated Carbon (PAC) Dosing Plant at Upper Peirce Outlet Works.

Owner: Public Utilities Board
$1,022,700June 2014
28Replacement of 10 pumpsets @ Lower Peirce and West Seletar Pumping Station

Owner: Public Utilities Board
S$4,026,100December 2016
29Treatment Automation and Auxiliary Works at Pulau Tekong Waterworks.

Owner: Public Utilities Board
S$7,456,000March 2018
30SDIC of Pumps, Pipes, Valves and Accessories – Relocation of Pumphouse & Substation at Singapore Changi Airport

Main Contractor: UES Holdings Pte Ltd
S$580,000April 2016
31Supply, Delivery, Installation, Testing & Commissioning of M&E Works & Systems for Anaerobic Digester System for Shah Alam

Owner: Ministry of Energy, Green
Technology & Water – Malaysia
RM3,878,816December 2019
32Design, Supply, Delivery, Testing & Commissioning of Digester Mixing System, Gas Recovery & Flaring System at Sungai Langat

Owner: Ministry of Energy, Green
Technology & Water – Malaysia
USD994,618January 2020
33Supply and Installation of Biogas Generator System at Changi WRP

Owner: Public Utilities Board
S$8,900,000December 2021
34Supply and Installation of Sludge Collector at Yen Xa Sewerage System, Hanoi City

JFE Engineering Corporation
USD1,330,000March 2023
35Supply, Delivery and Installation of Electrical and Plumbling & Sanitary System for ARC Tunnel, OMC and Substations 1 & 2 –Installation, Testing and Commissioning of Stormwater Pumping System

Main Contractor: Smitech Engineering Pte Ltd
S$810,000Ongoing
36Replacement of MEICA Equipment at Choa Chu Kang Waterworks Sludge Treatment Plant

Owner: Public Utilities Board
S$1,964,800February 2023
37Supply, delivery and Installation of 2 nos WesTech Clarifiers and Belt Press

Owner: Pfizer Asia Manufacturing Pte Ltd
S$1,860,750July 2023